Installing a pass box involves several critical steps to ensure proper functionality and adherence to cleanroom standards. Here’s a general guide for installing a pass box, which can be customized to the specific requirements of the VIETPHAT pass box:

Steps for Installing a Pass Box VIETPHAT

1. Planning and Preparation

  • Determine Location: Identify the exact location where the pass box will be installed, ensuring it fits seamlessly between the cleanroom and the adjoining space.
  • Dimensions Check: Verify the dimensions of the pass box and the opening where it will be installed.
  • Tools and Materials: Gather all necessary tools and materials, including screws, sealant, level, drill, and any other required installation hardware.

2. Cut the Opening

  • Mark the Area: Using the dimensions of the pass box, mark the area on the wall where the opening will be made.
  • Cut the Wall: Carefully cut the marked area to create the opening for the pass box. Ensure the edges are smooth and free of debris.

3. Install the Pass Box Frame

  • Position the Frame: Place the pass box frame into the opening. Ensure it is level and aligned properly.
  • Secure the Frame: Use screws and appropriate hardware to secure the frame to the wall. Make sure the frame is firmly attached and does not wobble.

4. Sealing and Insulation

  • Apply Sealant: Apply a sealant around the edges of the pass box frame to prevent any air leaks. This is crucial to maintain the integrity of the cleanroom environment.
  • Insulation (if required): Depending on the cleanroom standards, additional insulation may be required around the pass box.

5. Install the Pass Box Unit

  • Fit the Unit: Insert the pass box unit into the secured frame. Ensure it fits snugly and is aligned correctly.
  • Secure the Unit: Use screws and brackets to secure the pass box unit to the frame. Double-check that all components are tightly fastened.

6. Electrical Connections (if applicable)

  • Power Supply: If the pass box has electronic components such as intercom systems or UV lights, connect the power supply according to the manufacturer’s instructions.
  • Testing: Test all electrical components to ensure they are functioning properly.

7. Final Checks and Adjustments

  • Check Doors: Ensure that the pass box doors open and close smoothly. Verify that the interlocking mechanism (if any) works correctly to prevent both doors from being opened simultaneously.
  • Level and Alignment: Double-check the level and alignment of the pass box. Make any necessary adjustments.

8. Clean Up

  • Remove Debris: Clean up any debris or dust generated during the installation process.
  • Inspect and Clean: Inspect the pass box and surrounding area to ensure everything is clean and free of contaminants.

9. Documentation and Compliance

  • Document the Installation: Record the installation process, including measurements, tools used, and any deviations from the original plan.
  • Compliance Check: Ensure that the installation meets all relevant cleanroom standards and regulations.

By following these steps, you can ensure a proper and efficient installation of a VIETPHAT pass box. Always refer to the manufacturer’s specific installation guide for any additional requirements or recommendations.

---------------------------
Thông tin liên hệ:
Zalo: 0971.344.344
 Nhân viên phục vụ 24/7: 0827 077 078
 Nhân viên phục vụ 24/7: 0829 077 078
 Tổng đài 24/7: 0971 344 344
 Yêu cầu báo giá: sales@vietphat.com
 Website: www.vietphat.com
 Giao hàng tận nơi
CÁC DÒNG SẢN PHẨM CÔNG TY CỔ PHẦN KỸ THUẬT VIỆT PHÁT ĐANG CUNG CẤP:
- Lọc cuộn: G1, G2, G3, G4, M5
- Lọc thô dạng tấm: G1, G2, G3, G4
- Lọc thô dạng túi: G1, G2, G3, G4
- Lọc tinh dạng tấm: M5, M6, F7, F8, F9
- Lọc tinh dạng túi: M5, M6, F7, F8, F9
- Lọc EPA: E10, E11
- Lọc HEPA/ULPA: H13, H14, U15, U16, U17
- Lọc phòng gió vào, gió ra phòng sơn
- Lọc chịu nhiệt độ cao: G1, G2, G3, G4, M5, M6, F7, F8, F9, E10, E11, H13, H14, U15, U16, U17
- Hộp chứa lọc: G1, G2, G3, G4, M5, M6, F7, F8, F9, E10, E11, H13, H14, U15, U16, U17
- Hộp kết nối AHU: G1, G2, G3, G4, M5, M6, F7, F8, F9, E10, E11, H13, H14, U15, U16, U17
- Hộp lọc khí FFU/Fan Filter Unit (FFU): H13, H14, U15, U16, U17
- Bộ hộp lọc chảy tầng cho phòng mỗ bệnh viện: H13, H14, U15, U16, U17
- Buồng thổi khí/Air Shower, buồng trung chuyển/Pass Box, phòng sạch di động/clean booth
- Lọc cuộn carbon, lọc thô carbon, lọc tinh carbon, hạt lọc carbon
- Lọc dầu mỡ, lọc nhôm khung nhôm, lọc sương, máy lọc tĩnh điện
- Miệng gió, ống gió, van gió, phụ kiện van gió, hộp điều chỉnh lưu lượng gió-VAV Box, CAV Box, cầu chì van chặn lửa
- Ống nhôm nhún, ống mềm cách nhiệt, silicone chống cháy, simily quấn ống, đinh nhôm, đinh nhựa, vải thủy tinh, ke ống gió, ron ống gió, gối đỡ foam pu
- Vải thẩm thấu Ductsox, van Tozen, thiết bị khử khuẩn không khí Jonix, cảm biến khói Apollo, thiết bị đo Dwyer, chiller giải nhiệt Aermec, quạt lưu lượng cao tốc độ thấp BladeTec, thiết bị chống rung và kiểm soát độ ồn Mason


#Pass Box Installation VIETPHATPass Box Installation VIETPHATPass Box Installation VIETPHATPass Box Installation VIETPHAT

Thảo luận về chủ đề này